(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
Caution
thận trọng
For connecting low-pressure pipes and drain/ventilation pipes.
[Features]
·Secondary processing of piping is not required.
·Can be installed with a single torque wrench.
·Piping connections in narrow spaces are possible.
·It is cheaper than conventional products.
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to ShipSố ngày giao hàng | Applicable Plumbing | Applicable Fluid | Nominal Diameter (A) | Maximum Operating Pressure (MPa) | Rubber Sealing Material | Material of Bolt |
---|---|---|---|---|---|---|---|---|---|---|
486,200 VND | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 3/4B(20A) | 1.0 | EPDM | SCM435 | ||
781,078 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 3/4B(20A) | 1.0 | EPDM | SUS304 | ||
486,200 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 3/4B(20A) | 1.0 | NBR | SCM435 | ||
781,078 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 3/4B(20A) | 1.0 | NBR | SUS304 | ||
496,158 VND | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water | 1B(25A) | 1.0 | EPDM | SCM435 | ||
791,038 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water | 1B(25A) | 1.0 | EPDM | SUS304 | ||
791,038 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water / Oils and Fats | 1B(25A) | 1.0 | NBR | SUS304 | ||
506,121 VND | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water | 1 1/4B(32A) | 1.0 | EPDM | SCM435 | ||
800,996 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water | 1 1/4B(32A) | 1.0 | EPDM | SUS304 | ||
506,121 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water / Oils and Fats | 1 1/4B(32A) | 1.0 | NBR | SCM435 | ||
800,996 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water / Oils and Fats | 1 1/4B(32A) | 1.0 | NBR | SUS304 | ||
516,081 VND | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 1 1/2B(40A) | 1.0 | EPDM | SCM435 | ||
840,840 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 1 1/2B(40A) | 1.0 | EPDM | SUS304 | ||
516,081 VND | 1 Piece(s) | 9 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 1 1/2B(40A) | 1.0 | NBR | SCM435 | ||
840,840 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 1 1/2B(40A) | 1.0 | NBR | SUS304 | ||
711,356 VND | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 2B(50A) | 1.0 | EPDM | SCM435 | ||
964,345 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 2B(50A) | 1.0 | EPDM | SUS304 | ||
964,345 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 2B(50A) | 1.0 | NBR | SUS304 | ||
857,112 VND | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 2 1/2B(65A) | 0.7 | EPDM | SCM435 | ||
1,306,041 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 2 1/2B(65A) | 0.7 | EPDM | SUS304 | ||
857,112 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 2 1/2B(65A) | 0.7 | NBR | SCM435 | ||
1,306,041 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 2 1/2B(65A) | 0.7 | NBR | SUS304 | ||
1,048,582 VND | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 3B(80A) | 0.7 | EPDM | SCM435 | ||
1,499,760 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 3B(80A) | 0.7 | EPDM | SUS304 | ||
1,048,582 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 3B(80A) | 0.7 | NBR | SCM435 | ||
1,499,760 VND | 1 Piece(s) | 10 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 3B(80A) | 0.7 | NBR | SUS304 | ||
1,520,256 VND | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 4B(100A) | 0.5 | EPDM | SCM435 | ||
2,055,921 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 4B(100A) | 0.5 | EPDM | SUS304 | ||
1,520,256 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 4B(100A) | 0.5 | NBR | SCM435 | ||
2,055,921 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 4B(100A) | 0.5 | NBR | SUS304 | ||
2,142,657 VND | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 5B(125A) | 0.3 | EPDM | SCM435 | ||
2,678,321 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 5B(125A) | 0.3 | EPDM | SUS304 | ||
2,678,321 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 5B(125A) | 0.3 | NBR | SUS304 | ||
2,785,304 VND | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 6B(150A) | 0.3 | EPDM | SCM435 | ||
3,320,968 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 6B(150A) | 0.3 | EPDM | SUS304 | ||
2,785,304 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 6B(150A) | 0.3 | NBR | SCM435 | ||
3,320,968 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 6B(150A) | 0.3 | NBR | SUS304 | ||
4,392,297 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 8B(200A) | 0.3 | EPDM | SCM435 | ||
5,289,903 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 8B(200A) | 0.3 | EPDM | SUS304 | ||
4,392,297 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 8B(200A) | 0.3 | NBR | SCM435 | ||
5,289,903 VND | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 8B(200A) | 0.3 | NBR | SUS304 |
Loading...Tải…
Type | Joint | Body Material | Stainless Steel | Tightening Bolt Type | Hexagon socket head bolt |
---|
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy