(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
JIS standard (B2301 screw-in type malleable cast iron pipe fittings) correct fittings.
[Features]
·Conforms to JIS standards.
·The appearance is exactly the same as the conventional product.
· Made in Japan.
[Applications]
·For removing branches from white pipes.
Part Number |
---|
T-6-W |
T-8-W |
T-10-W |
T-15-W |
T-20-W |
T-25-W |
T-32-W |
T-40-W |
T-50-W |
T-65-W |
T-80-W |
T-100-W |
T-125-W |
T-150-W |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to ShipSố ngày giao hàng | Nominal of Thread M1 | Applicable Fluid | Surface Treatment |
---|---|---|---|---|---|---|---|
144,811 VND | 1 Piece(s) | 7 Day(s) or more | 1/8B(6A) | Water / Air / Gas / Oil | Zinc Plating | ||
144,811 VND | 1 Piece(s) | 7 Day(s) or more | 1/4B(8A) | Water / Air / Gas / Oil | Zinc Plating | ||
144,811 VND | 1 Piece(s) | 7 Day(s) or more | 3/8B(10A) | Water / Air / Gas / Oil | Zinc Plating | ||
123,298 VND | 1 Piece(s) | 7 Day(s) or more | 1/2B(15A) | Water / Air / Gas / Oil | Zinc Plating | ||
131,665 VND | 1 Piece(s) | 7 Day(s) or more | 3/4B(20A) | Water / Air / Gas / Oil | Zinc Plating | ||
160,351 VND | 1 Piece(s) | 7 Day(s) or more | 1B(25A) | Water / Air / Gas / Oil | Zinc Plating | ||
214,136 VND | 1 Piece(s) | 7 Day(s) or more | 1 1/4B(32A) | Water / Air / Gas / Oil | Zinc Plating | ||
245,213 VND | 1 Piece(s) | 7 Day(s) or more | 1 1/2B(40A) | Water / Air / Gas / Oil | Zinc Plating | ||
334,855 VND | 1 Piece(s) | 7 Day(s) or more | 2B(50A) | Water / Air / Gas / Oil | Zinc Plating | ||
636,056 VND | 1 Piece(s) | 7 Day(s) or more | 2 1/2B(65A) | Water / Air / Gas / Oil | Zinc Plating | ||
888,251 VND | 1 Piece(s) | 7 Day(s) or more | 3B(80A) | Water / Air / Gas / Oil | Zinc Plating | ||
1,436,270 VND | 1 Piece(s) | 7 Day(s) or more | 4B(100A) | Water / Air / Gas / Oil | Zinc Plating | ||
3,777,895 VND | 1 Piece(s) | 7 Day(s) or more | 5B(125A) | Water / Air / Gas / Oil | Zinc Plating | ||
5,729,583 VND | 1 Piece(s) | 7 Day(s) or more | 6B(150A) | Water / Air / Gas / Oil | Zinc Plating |
Loading...Tải…
Connecting Shape | Tee | Connection Type | Screw⇔Screw Same Diameter・Different Type | Material | Cast Iron |
---|---|---|---|---|---|
Connection Thread Type M1 | Rc | Type | Fitting | Max. Operating Pressure(MPa) | 2.5 |
Divisions of Max. Operating Pressure | than 2.0Mpa | Interior Resin Lining | No |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy