(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
Use by connecting to a coupling when bleeding air and measuring pressure.
Part Number |
---|
201-16.040 |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to ShipSố ngày giao hàng | Applicable Fluid | Length L (mm) | Fitting Material: | The treatment of Metal fittings surface |
---|---|---|---|---|---|---|---|---|
3,345,748 VND | 1 Piece(s) | 6 Day(s) or more | General Hydraulic Oil / Water / Air / Chemical | 400 | Stainless Steel | No |
Loading...Tải…
Max. Operation Temperature (At 100 ℃ Operation Temperature)(MPa) | 32.3 | Swage Fittings | The straight of both sides | Swage Fittings – L-Formed | Metal fittingsD |
---|---|---|---|---|---|
Swage Fittings – R-Formed | Metal fittingsD | Inner Dia. d(Ø) | 2 | Material | Polyamide |
Outer Sheath Cover | No | Operating Temperature Range(°C) | -40::100 | Minimum Bending Radius(mm) | 20 |
Please check the type/dimensions/specifications of the part 201-16.040 in the QUICK-TEST High Pressure Hose series.Vui lòng kiểm tra kiểu/kích thước/thông số kỹ thuật của phần 201-16.040 trong chuỗi QUICK-TEST High Pressure Hose.
Part Number |
---|
200-16.100 |
200-16.150 |
200-16.200 |
201-16.063 |
201-16.080 |
201-16.100 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to ShipSố ngày giao hàng | Applicable Fluid | Length L (mm) | Fitting Material: | The treatment of Metal fittings surface |
---|---|---|---|---|---|---|---|---|
1,519,680 VND | 1 Piece(s) | 4 Day(s) or more | Air / Chemical / General Hydraulic Oil | 1000 | Iron | Zinc-Nickel Alloy Plating | ||
1,605,481 VND | 1 Piece(s) | 4 Day(s) or more | Air / Chemical / General Hydraulic Oil | 1500 | Iron | Zinc-Nickel Alloy Plating | ||
1,768,288 VND | 1 Piece(s) | 4 Day(s) or more | Air / Chemical / General Hydraulic Oil | 2000 | Iron | Zinc-Nickel Alloy Plating | ||
3,536,986 VND | 1 Piece(s) | 6 Day(s) or more | Air / Chemical / General Hydraulic Oil / Water | 630 | Stainless Steel | No | ||
3,728,223 VND | 1 Piece(s) | 6 Day(s) or more | Air / Chemical / General Hydraulic Oil / Water | 800 | Stainless Steel | No | ||
3,919,463 VND | 1 Piece(s) | 6 Day(s) or more | Air / Chemical / General Hydraulic Oil / Water | 1000 | Stainless Steel | No |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy