(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C or below), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).
Part Number |
---|
FU-1/2B-W |
FU-1/4B-W |
FU-1/8B-W |
FU-1B-W |
FU-2B-W |
FU-3/4B-W |
FU-3/8B-W |
FU-3B-W |
FU-4B-W |
FU-11/2B-W |
FU-11/4B-W |
FU-21/2B-W |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to ShipSố ngày giao hàng | Nominal of Thread M1 | Applicable Fluid | Surface Treatment |
---|---|---|---|---|---|---|---|
130,005 VND | 1 Piece(s) | 8 Day(s) or more | 1/2B(15A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
114,865 VND | 1 Piece(s) | 8 Day(s) or more | 1/4B(8A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
114,865 VND | 1 Piece(s) | 12 Day(s) or more | 1/8B(6A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
204,508 VND | 1 Piece(s) | 7 Day(s) or more | 1B(25A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
553,918 VND | 1 Piece(s) | 7 Day(s) or more | 2B(50A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
127,658 VND | 1 Piece(s) | 6 Day(s) or more | 3/4B(20A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
114,865 VND | 1 Piece(s) | 8 Day(s) or more | 3/8B(10A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
1,471,750 VND | 1 Piece(s) | 8 Day(s) or more | 3B(80A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
2,400,500 VND | 1 Piece(s) | 8 Day(s) or more | 4B(100A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
382,641 VND | 1 Piece(s) | 6 Day(s) or more | 1 1/2B(40A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
257,498 VND | 1 Piece(s) | 8 Day(s) or more | 1 1/4B(32A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating | ||
1,147,000 VND | 1 Piece(s) | 8 Day(s) or more | 2 1/2B(65A) | Water / Air / Gas / Oil | [Zinc Plating] Hot zinc plating |
Loading...Tải…
Connecting Shape | Union | Connection Type | Screw⇔Screw Same Diameter・Different Type | Material | STPG370(SCH40) |
---|---|---|---|---|---|
Connection Thread Type M1 | Rc | Type | Fitting | Max. Operating Pressure(MPa) | 2.5 |
Divisions of Max. Operating Pressure | than 2.0Mpa | Interior Resin Lining | No |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy