(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
Caution
thận trọng
Speed controller with one-touch fitting with metal body type specification.
[Features]
· Metal body elbow type.
· Uses flame-resistant resin as standard (UL standard V-0).
Dimensional Outline Drawing
Model | Applicable tubing outer diameter d | T | H | D1 | D2 | L1 | L2 | L3 | Note 1) L4 | Note 2) A | M1 | Weight g | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
MAX | MIN | MAX | MIN | |||||||||||
AS12□1-M5-F04 | 4 | M5 × 0.8 | 8 | 13 | 9 | 21 | 25.5 | 11.2 | 28.3 | 25.5 | 25 | 22.2 | 16 | 13 |
AS12□1-M5-F06 | 6 | 21.5 | 26 | 17 | 13 | |||||||||
AS22□1-01-F06S | 6 | R1/8 | 12 | 15.5 | 14.6 | 26.6 | 33.9 | 13.8 | 35.5 | 30.5 | 32.4 | 27.4 | 17 | 34 |
AS22□1-01-F08S | 8 | 18.5 | 31 | |||||||||||
AS22□1-02-F06S | 6 | R1/4 | 17 | 15.5 | 19.5 | 28.7 | 38.5 | 17.2 | 40.3 | 35.3 | 34.8 | 29.8 | 17 | 54 |
AS22□1-02-F08S | 8 | 18.5 | 50 | |||||||||||
AS22□1-02-F10S | 10 | 18.2 | 34.5 | 44.3 | 18.6 | 21 | 52 | |||||||
AS32□1-02-F08S | 8 | R1/4 | 19 | 18.2 | 24.3 | 32.7 | 44.9 | 21 | 48.3 | 43.3 | 42.8 | 37.8 | 18.5 | 86 |
AS32□1-02-F10S | 10 | 33.3 | 45.5 | 21 | 81 | |||||||||
AS32□1-03-F08S | 8 | R 3/8 | 19 | 18.2 | 24.3 | 32.7 | 44.9 | 19 | 45.8 | 44.9 | 40.6 | 35.6 | 18.5 | 93 |
AS32□1-03-F10S | 10 | 33.3 | 45.5 | 21 | 88 | |||||||||
AS42□1-04-F10S | 10 | R 1/2 | 24 | 22.3 | 28.5 | 36.1 | 50.4 | 24.6 | 54.7 | 49.7 | 47.4 | 42.4 | 21 | 154 |
AS42□1-04-F12S | 12 | 22 | 146 |
Note 1) Reference dimensions
Note 2) Reference dimensions of M5 and R threads after installation
AS1201-M5 structural drawing
AS2201/3201/4201 structural drawing
AS3201-02 structural drawing
No. | Part Name | Material | Note | |
---|---|---|---|---|
1 | Body A | Zinc alloy | Chromate treated | |
2 | Body B | Brass | Electroless nickel plating | |
3 | Needle | Brass | Electroless nickel plating | |
4 | Needle guide | Brass | Note 1) | |
5 | Seat ring | Brass | Note 2) | |
6 | Lock nut | SteelNote 3) | Meter-out | Zinc chromateNote 4) |
Meter-in | Black zinc chromate plated | |||
7 | Handle | Brass | Electroless nickel plating | |
8 | Bushing | PBT | - | |
9 | Cassette | PBT / stainless steel | - | |
10 | U-seal | HNBR | - | |
11 | Seal | NBR | - | |
12 | O-ring | NBR | - | |
13 | O-ring | NBR | - | |
14 | O-ring | NBR | - | |
15 | O-ring | NBR | - | |
16 | Gasket | NBR / stainless steel | M5 type only |
Note 1) Only M5 type and AS32□1-02 type are electroless nickel plated.
Note 2) AS22□1 type and AS32□1 type are electroless nickel plated.
Note 3) The material of the lock nut option J (round type) is brass. For AS22□1 only, it is made of steel.
Note 4) The surface treatment of the lock nut option J (round type) is electroless nickel plated.
Usable fluids | Air |
---|---|
Proof pressure | 1.5 MPa |
Max. operating pressure | 1 MPa |
Min. operating pressure | 0.1 MPa |
Ambient and fluid temperature | -5 to 60℃ (no freezing) |
Applicable tubing material | FR double layer, FR three-layer, FR soft nylon, nylon, soft nylon, polyurethane |
Option | Round lock nut, Note)Electroless nickel plated specification |
Meter-out type and meter-in type can be visually differentiated by the lock nut.
The lock nut on the meter-out type is zinc chromate plated (round-type lock nut is electroless nickel plated), while the meter-in type is black zinc chromate plated.
Note) All brass components are electroless nickel plated.
Model | AS12□1-M5 | AS22□1-01 | AS22□1-02 | AS32□1 | AS42□1-04 | ||||
---|---|---|---|---|---|---|---|---|---|
Tube outer diameter | ø4, ø6 | ø6, ø8 | ø6 | ø8, ø10 | ø8 | ø10 | ø10 | ø12 | |
Controlled flow Free flow | Flow rate L/min (ANR) | 100 | 230 | 390 | 460 | 790 | 920 | 1,580 | 1,710 |
Sonic conductance dm3/(s·bar) | 0.3 | 0.7 | 1.2 | 1.4 | 2.4 | 2.8 | 4.8 | 5.2 | |
Critical pressure ratio | Controlled | 0.2 | 0.25 | 0.3 | 0.25 | 0.25 | |||
Free | 0.4 | 0.2 | 0.3 | 0.2 | 0.3 |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to ShipSố ngày giao hàng | Control Method | Environment, Applications | Lock Nut Option | Connection Dia. | Option | Types of Screw | Applicable Tube O.D. mm (mm) | Body Size | Made-to-order specifications |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | 1 Piece(s) | Quote | Meter-Out | Clean circumstance | Hexagon Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 standards | - | ||
- | 1 Piece(s) | Quote | Meter-Out | Clean circumstance | Hexagon Shape Lock Nut | 1/8 | None | R | 8 | 01, 02 standards | - | ||
- | 1 Piece(s) | Quote | Meter-Out | Clean circumstance | Hexagon Shape Lock Nut | 1/4 | None | R | 6 | 01, 02 standards | - | ||
- | 1 Piece(s) | Quote | Meter-Out | Clean circumstance | Hexagon Shape Lock Nut | 1/4 | None | R | 8 | 01, 02 standards | - | ||
- | 1 Piece(s) | Quote | Meter-In | Clean circumstance | Hexagon Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 standards | - | ||
- | 1 Piece(s) | Quote | Meter-In | Clean circumstance | Hexagon Shape Lock Nut | 1/8 | None | R | 8 | 01, 02 standards | - | ||
- | 1 Piece(s) | Quote | Meter-In | Clean circumstance | Hexagon Shape Lock Nut | 1/4 | None | R | 6 | 01, 02 standards | - | ||
- | 1 Piece(s) | Quote | Meter-In | Clean circumstance | Hexagon Shape Lock Nut | 1/4 | None | R | 8 | 01, 02 standards | - | ||
354,400 VND | 1 Piece(s) | Same day | Meter-Out | Standard | Hexagon Shape Lock Nut | 5×0.8 | None | M | 4 | M5 standard | None | ||
307,494 VND | 1 Piece(s) | 37 Day(s) | Meter-Out | Standard | Round Shape Lock Nut | 5×0.8 | None | M | 4 | M5 standard | None | ||
354,400 VND | 1 Piece(s) | Same day | Meter-Out | Standard | Hexagon Shape Lock Nut | 5×0.8 | None | M | 6 | M5 standard | None | ||
354,400 VND | 1 Piece(s) | 32 Day(s) | Meter-Out | Standard | Round Shape Lock Nut | 5×0.8 | None | M | 6 | M5 standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 5×0.8 | None | M | 6 | M5 standard | Lubricant: Petroleum jelly | ||
354,400 VND | 1 Piece(s) | Same day | Meter-In | Standard | Hexagon Shape Lock Nut | 5×0.8 | None | M | 4 | M5 standard | None | ||
354,400 VND | 1 Piece(s) | 32 Day(s) | Meter-In | Standard | Round Shape Lock Nut | 5×0.8 | None | M | 4 | M5 standard | None | ||
354,400 VND | 1 Piece(s) | Same day | Meter-In | Standard | Hexagon Shape Lock Nut | 5×0.8 | None | M | 6 | M5 standard | None | ||
- | 1 Piece(s) | Quote | Meter-In | Standard | Round Shape Lock Nut | 5×0.8 | None | M | 6 | M5 standard | None | ||
448,000 VND | 1 Piece(s) | Same day | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 Standard | None | ||
448,000 VND | 1 Piece(s) | Same day | Meter-Out | Standard | Round Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 standards | Lubricant: Petroleum jelly | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 standards | Lubrication-free (seal of fluorine coating) + throttle valve (Without check valve) | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Round Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 standards | Lubrication-free (seal of fluorine coating) + throttle valve (Without check valve) | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 standards | Throttle valve (no check valve) | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Round Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 standards | Throttle valve (no check valve) | ||
448,000 VND 255,360 VND | 1 Piece(s) | Same day | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/8 | None | R | 8 | 01, 02 Standard | None | ||
448,000 VND | 1 Piece(s) | 32 Day(s) | Meter-Out | Standard | Round Shape Lock Nut | 1/8 | None | R | 8 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/8 | None | R | 8 | 01, 02 standards | Lubrication-free (seal of fluorine coating) + throttle valve (Without check valve) | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/8 | None | R | 8 | 01, 02 standards | Throttle valve (no check valve) | ||
448,000 VND 255,360 VND | 1 Piece(s) | Same day | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 6 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Round Shape Lock Nut | 1/4 | None | R | 6 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 6 | 01, 02 standards | Lubrication-free (seal of fluorine coating) + throttle valve (Without check valve) | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Round Shape Lock Nut | 1/4 | None | R | 6 | 01, 02 standards | Lubrication-free (seal of fluorine coating) + throttle valve (Without check valve) | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 6 | 01, 02 standards | Throttle valve (no check valve) | ||
448,000 VND 255,360 VND | 1 Piece(s) | Same day | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 8 | 01, 02 Standard | None | ||
448,000 VND | 1 Piece(s) | 32 Day(s) | Meter-Out | Standard | Round Shape Lock Nut | 1/4 | None | R | 8 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 8 | 01, 02 standards | Lubricant: Petroleum jelly | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 8 | 01, 02 standards | Lubrication-free (seal of fluorine coating) + throttle valve (Without check valve) | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 8 | 01, 02 standards | Throttle valve (no check valve) | ||
448,000 VND | 1 Piece(s) | 32 Day(s) | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 10 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 10 | 01, 02 standards | Lubricant: Petroleum jelly | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 10 | 01, 02 standards | Throttle valve (no check valve) | ||
448,000 VND 255,360 VND | 1 Piece(s) | Same day | Meter-In | Standard | Hexagon Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 Standard | None | ||
448,000 VND | 1 Piece(s) | 32 Day(s) | Meter-In | Standard | Round Shape Lock Nut | 1/8 | None | R | 6 | 01, 02 Standard | None | ||
448,000 VND | 1 Piece(s) | 32 Day(s) | Meter-In | Standard | Hexagon Shape Lock Nut | 1/8 | None | R | 8 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-In | Standard | Round Shape Lock Nut | 1/8 | None | R | 8 | 01, 02 Standard | None | ||
448,000 VND | 1 Piece(s) | 32 Day(s) | Meter-In | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 6 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-In | Standard | Round Shape Lock Nut | 1/4 | None | R | 6 | 01, 02 Standard | None | ||
448,000 VND | 1 Piece(s) | 32 Day(s) | Meter-In | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 8 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-In | Standard | Round Shape Lock Nut | 1/4 | None | R | 8 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-In | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 10 | 01, 02 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 8 | 03 Standard | None | ||
596,800 VND | 1 Piece(s) | Same day | Meter-Out | Standard | Hexagon Shape Lock Nut | 1/4 | None | R | 10 | 03 Standard | None | ||
596,800 VND | 1 Piece(s) | Same day | Meter-Out | Standard | Hexagon Shape Lock Nut | 3/8 | None | R | 8 | 03 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Round Shape Lock Nut | 3/8 | None | R | 8 | 03 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 3/8 | None | R | 8 | 03 criteria | Throttle valve (no check valve) | ||
619,200 VND | 1 Piece(s) | 32 Day(s) | Meter-Out | Standard | Hexagon Shape Lock Nut | 3/8 | Electroless Nickel-Plated | R | 8 | 03 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Round Shape Lock Nut | 3/8 | Electroless Nickel-Plated | R | 8 | 03 Standard | None | ||
596,800 VND | 1 Piece(s) | 32 Day(s) | Meter-Out | Standard | Hexagon Shape Lock Nut | 3/8 | None | R | 10 | 03 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Round Shape Lock Nut | 3/8 | None | R | 10 | 03 Standard | None | ||
- | 1 Piece(s) | Quote | Meter-Out | Standard | Hexagon Shape Lock Nut | 3/8 | None | R | 10 | 03 criteria | Throttle valve (no check valve) |
Loading...Tải…
Type | Speed Controller | Format | Cylinder direct-connected elbow type | Joint Type | Male thread + One-Touch Couplings |
---|---|---|---|---|---|
Material | Zinc Alloy | Thread Material | Stainless steel 303 | Knob Type | Standard |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy