(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
Caution
thận trọng
Lateral direction vacuum entry type suction pad with buffer.
[Features]
· Ideal for workpieces with a curved surface, heavyweight workpieces and workpieces with large surface areas.
· Compatible with heavy-duty, flat-type pads with ribbing.
· Easily adapts to the shape of the workpiece, allowing it to suction to the side of cylinders.
· The pad shape allows suction, even on inclined/sloped surfaces.
ZPX Series with buffer external appearance
Pad Types
Mounting Connection | Vacuum Entry Direction | Lateral direction | |
---|---|---|---|
Connection Method | Male Thread | ||
Thread Diameter | ø40 mm, ø50 mm | M18 × 1.5 | |
ø63 mm, ø80 mm | M18 × 1.5 | ||
ø100 mm, ø125 mm | M22 × 1.5 | ||
Vacuum Entry Port | 1/8 (Rc, NPT, NPTF) |
Pad Diameter (mm) | ø40 to ø80 mm | ø100 mm, ø125 mm | ||
---|---|---|---|---|
Stroke (mm) | 25, 50, 75 | 25, 50, 75, 100 | ||
Spring Reaction Force | 0 Stroke | 6.9 N | 0 Stroke | 10 N |
Full Stroke | 11.8 N | Full Stroke | 15 N | |
Non-Rotating Specifications | Rotating (J) |
ZPX(50, 40)HB□J□-□01-A18 (male thread) dimensional drawing
(Unit: mm)
Model | A | B | C | D | E | F | G | H | I | J | Y |
---|---|---|---|---|---|---|---|---|---|---|---|
ZPX40HB□J25-□01-A18 | 40 | 41 | 28 | 43 | 20.5 | 32 | 47 | 69 | 109 | 160 | 13 |
ZPX40HB□J50-□01-A18 | 144 | 195 | |||||||||
ZPX40HB□J75-□01-A18 | 180 | 231 | |||||||||
ZPX50HB□J25-□01-A18 | 50 | 52 | 36 | 54 | 24 | 35.5 | 50.5 | 72.5 | 112.5 | 163.5 | 16.5 |
ZPX50HB□J50-□01-A18 | 147.5 | 198.5 | |||||||||
ZPX50HB□J75-□01-A18 | 183.5 | 234.5 |
ZPX(80, 63)HB□J□-□01-A18 (male thread) dimensional drawing
(Unit: mm)
Model | A | B | C | D | E | F | G | H | I | J | Y |
---|---|---|---|---|---|---|---|---|---|---|---|
ZPX63HB□J25-□01-A18 | 63 | 65 | 46 | 68 | 31.5 | 43 | 58 | 80 | 120 | 171 | 21.5 |
ZPX63HB□J50-□01-A18 | 155 | 206 | |||||||||
ZPX63HB□J75-□01-A18 | 191 | 242 | |||||||||
ZPX80HB□J25-□01-A18 | 80 | 83 | 58 | 85 | 37 | 48.5 | 63.5 | 85.5 | 125.5 | 176.5 | 27.5 |
ZPX80HB□J50-□01-A18 | 160.5 | 211.5 | |||||||||
ZPX80HB□J75-□01-A18 | 196.5 | 247.5 |
ZPX(125, 100)HB□J□-□01-A22 (male thread) dimensional drawing
(Unit: mm)
Model | A | B | C | D | E | F | G | H | I | J | Y |
---|---|---|---|---|---|---|---|---|---|---|---|
ZPX100HB□J25-□01-A22 | 100 | 103 | 69 | 107 | 47.5 | 60.5 | 75.5 | 97.5 | 141.5 | 212.5 | 35.5 |
ZPX100HB□J50-□01-A22 | 177.5 | 248.5 | |||||||||
ZPX100HB□J75-□01-A22 | 217.5 | 288.5 | |||||||||
ZPX100HB□J100-□01-A22 | 252.5 | 323.5 | |||||||||
ZPX125HB□J25-□01-A22 | 125 | 129 | 89 | 135 | 56 | 69 | 84 | 106 | 150 | 221 | 44 |
ZPX125HB□J50-□01-A22 | 186 | 257 | |||||||||
ZPX125HB□J75-□01-A22 | 226 | 297 | |||||||||
ZPX125HB□J100-□01-A22 | 261 | 332 |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to ShipSố ngày giao hàng | RoHS | Rubber Group Material | Environment | Pad diameter (ø) | Vacuum entry port thread diameter | Buffer stroke (mm) | Mounting connection screw | Buffer body material |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1,405,773 VND | 1 Piece(s) | 32 Day(s) | - | EPDM+Polyethylene+Reinforcing fiber | Standard | 40 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 40 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 40 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
1,787,000 VND | 1 Piece(s) | 32 Day(s) | - | [Nitrile Rubber] NBR | Standard | 40 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Nitrile Rubber] NBR | Standard | 40 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Nitrile Rubber] NBR | Standard | 40 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
1,900,000 VND | 1 Piece(s) | 32 Day(s) | - | [Silicon Rubber] Silicone Rubber | Standard | 40 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Silicon Rubber] Silicone Rubber | Standard | 40 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Silicon Rubber] Silicone Rubber | Standard | 40 | NPT 1/8 | 50 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Silicon Rubber] Silicone Rubber | Standard | 40 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Urethane Rubber | Standard | 40 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Urethane Rubber | Standard | 40 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Urethane Rubber | Standard | 40 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | EPDM+Polyethylene+Reinforcing fiber | Standard | 50 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 50 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 50 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 50 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
1,810,000 VND | 1 Piece(s) | 32 Day(s) | - | [Nitrile Rubber] NBR | Standard | 50 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Nitrile Rubber] NBR | Standard | 50 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Nitrile Rubber] NBR | Standard | 50 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Silicon Rubber] Silicone Rubber | Standard | 50 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
1,968,000 VND | 1 Piece(s) | 32 Day(s) | - | [Silicon Rubber] Silicone Rubber | Standard | 50 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
2,013,000 VND | 1 Piece(s) | 32 Day(s) | - | [Silicon Rubber] Silicone Rubber | Standard | 50 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Urethane Rubber | Standard | 50 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Urethane Rubber | Standard | 50 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Urethane Rubber | Standard | 50 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | EPDM+Polyethylene+Reinforcing fiber | Standard | 63 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 63 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 63 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 63 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
1,968,000 VND | 1 Piece(s) | 32 Day(s) | - | [Nitrile Rubber] NBR | Standard | 63 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
2,013,000 VND | 1 Piece(s) | 32 Day(s) | - | [Nitrile Rubber] NBR | Standard | 63 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
2,059,000 VND | 1 Piece(s) | 32 Day(s) | - | [Nitrile Rubber] NBR | Standard | 63 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Silicon Rubber] Silicone Rubber | Standard | 63 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Silicon Rubber] Silicone Rubber | Standard | 63 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
2,194,000 VND | 1 Piece(s) | 32 Day(s) | - | [Silicon Rubber] Silicone Rubber | Standard | 63 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Urethane Rubber | Standard | 63 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Urethane Rubber | Standard | 63 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Urethane Rubber | Standard | 63 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 80 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 80 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
2,013,000 VND | 1 Piece(s) | 32 Day(s) | - | [Nitrile Rubber] NBR | Standard | 80 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
2,059,000 VND | 1 Piece(s) | 32 Day(s) | - | [Nitrile Rubber] NBR | Standard | 80 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Nitrile Rubber] NBR | Standard | 80 | NPT 1/8 | 50 | M18 × 1.5 | - | ||
2,104,000 VND | 1 Piece(s) | 32 Day(s) | - | [Nitrile Rubber] NBR | Standard | 80 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Nitrile Rubber] NBR | Standard | 80 | NPT 1/8 | 75 | M18 × 1.5 | - | ||
2,262,000 VND | 1 Piece(s) | 32 Day(s) | - | [Silicon Rubber] Silicone Rubber | Standard | 80 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | [Silicon Rubber] Silicone Rubber | Standard | 80 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
2,353,000 VND | 1 Piece(s) | 32 Day(s) | - | [Silicon Rubber] Silicone Rubber | Standard | 80 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Urethane Rubber | Standard | 80 | Rc 1/8 | 25 | M18 × 1.5 | - | ||
2,421,000 VND | 1 Piece(s) | 4 Day(s) | - | Urethane Rubber | Standard | 80 | Rc 1/8 | 50 | M18 × 1.5 | - | ||
2,466,000 VND | 1 Piece(s) | 4 Day(s) | - | Urethane Rubber | Standard | 80 | Rc 1/8 | 75 | M18 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | EPDM+Polyethylene+Reinforcing fiber | Standard | 100 | Rc 1/8 | 25 | M22 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | EPDM+Polyethylene+Reinforcing fiber | Standard | 100 | Rc 1/8 | 50 | M22 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | EPDM+Polyethylene+Reinforcing fiber | Standard | 100 | Rc 1/8 | 75 | M22 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | EPDM+Polyethylene+Reinforcing fiber | Standard | 100 | Rc 1/8 | 100 | M22 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 100 | Rc 1/8 | 25 | M22 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 100 | Rc 1/8 | 50 | M22 × 1.5 | - | ||
- | 1 Piece(s) | Quote | - | Fluororubber | Standard | 100 | Rc 1/8 | 100 | M22 × 1.5 | - | ||
2,624,000 VND | 1 Piece(s) | 32 Day(s) | - | [Nitrile Rubber] NBR | Standard | 100 | Rc 1/8 | 25 | M22 × 1.5 | - |
Loading...Tải…
Pad Type | Standard | Pad Shape | Large Belllow Pad | Mounting Method | Attachment Type |
---|---|---|---|---|---|
Vacuum Outlet Port | Female Thread | Material | Rubber Group |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy