(!) Since support from Microsoft will end on January 14th, 2020, Windows 7 will be excluded from the recommended environment from December 15th, 2019 on this site. Vì lý do Microsoft kết thúc hỗ trợ cho Windows 7 vào ngày 14/01/2020, Windows 7 sẽ là hệ điều hành không được khuyến khích sử dụng với trang web này từ ngày 15/12/2019.
Select part number to Order Now/ Add to Cart
Designed for dissimilar metal joints, so it cannot be used for stainless steel pipes.
[Features]
· Wide selection of products for surface treatments.
· Prevents bolt from dropping out during construction work, allowing safe and quick operation.
· Due to recent environmental degradation affecting water supply, a high concentration of chlorine has been used for sterilization, significantly affecting pipes.
· As a result, we have developed and adopted a gasket with heat resistant and chlorine resistant properties.
· Because we offer a wide range of stainless steel SUS Top Systems, joining of mid to large diameter stainless steel piping is made easy via combinations of top joint epoxy-coated products and Nylon-coated products.
· Pipe treatment and joining are simpler and faster than when threaded fittings or weld joining is used.
· Structurally strong and flexible against pipe sagging and stretching (able to support loop piping, etc.).
· Fitting suppresses elastic flexibility, supporting the R-5 and R-11, by providing unevenness on the mating surface of the housing.
Part Number |
---|
TOPJ-T-1-3X1B-R |
TOPJ-T-1-3X1B-W |
TOPJ-T-1-3X2B-R |
TOPJ-T-1-3X2B-W |
TOPJ-T-1-3X11/2B-R |
TOPJ-T-1-3X11/2B-W |
TOPJ-T-1-3X11/4B-R |
TOPJ-T-1-3X11/4B-W |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to ShipSố ngày giao hàng | Nominal | Nominal Second End | Surface Paint |
---|---|---|---|---|---|---|---|
1,046,420 VND | 1 Piece(s) | 8 Day(s) or more | 3B(80A) | 1B(25A) | Primary Anti-rust Coating (Tail End R) | ||
1,143,635 VND | 1 Piece(s) | 12 Day(s) or more | 3B(80A) | 1B(25A) | Hot zinc plating (end-W) | ||
1,046,420 VND | 1 Piece(s) | 8 Day(s) or more | 3B(80A) | 2B(50A) | Primary Anti-rust Coating (Tail End R) | ||
1,143,233 VND | 1 Piece(s) | 12 Day(s) or more | 3B(80A) | 2B(50A) | Hot zinc plating (end-W) | ||
1,046,420 VND | 1 Piece(s) | 8 Day(s) or more | 3B(80A) | 1 1/2B(40A) | Primary Anti-rust Coating (Tail End R) | ||
1,143,635 VND | 1 Piece(s) | 12 Day(s) or more | 3B(80A) | 1 1/2B(40A) | Hot zinc plating (end-W) | ||
1,046,420 VND | 1 Piece(s) | 8 Day(s) or more | 3B(80A) | 1 1/4B(32A) | Primary Anti-rust Coating (Tail End R) | ||
1,143,233 VND | 1 Piece(s) | 12 Day(s) or more | 3B(80A) | 1 1/4B(32A) | Hot zinc plating (end-W) |
Loading...Tải…
Type | Joint (branch and screw type) | Applicable Pipe | Steel pipe | Applicable Fluid | Water |
---|---|---|---|---|---|
Maximum Operating Pressure(MPa) | 2 | Gasket material | EPDM | Body Material | Cast Iron |
Tightening Bolt Type | Bolt Nut |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy